GREEN RIVER BASIN 03 JUL 2025 at 0751 MAIN BY-PASS DATA INST AVG POOL EL 24 HR GATE OPENINGS LEVEL OUT- 24 HR % LAKE TIME FT-MSL CHG-TND OPNGS #1 #2 #1 #2 FLOW INFLOW STOR GRR 0600 678.10 -1.16 1.50 0.00 0.00 3 8 5195 61 5.5 NRR 0600 515.45 -0.04 0.20 0.00 0.00 0 0 1118 1002 0.6 BRR 0600 567.98 -0.42 0.70 0.00 0.00 0 0 3500 606 29.3 RRR 0600 505.70 -0.5 0.70 0.00 0.00 0 0 1743 61 36.2 RAIN PRES AIR TEMP TAILWATER LAKE TIME INCH WTHR PRE MAX MIN EL-MSL FLOW TEMP GRR 0600 0.00 FOG 65 87 62 102.41 5228 22.9 NRR 0600 0.00 FOG 68 91 66 20.60 826 20.0 BRR 0600 0.00 CLR 67 86 66 84.83 3656 19.4 RRR 0600 0.00 CLR 64 91 61 40.11 1739 0.0 PREVIOUS 24 HOUR ELEVATIONS 0600 1200 1800 2400 GRR 679.26 678.97 678.67 678.39 NRR 515.49 515.48 515.47 515.46 BRR 568.40 568.29 568.19 568.09 RRR 506.20 506.08 505.95 505.83 OUTLET SETTINGS (ANTICIPATED NEXT 6 AM) MAIN BY-PASSES LEVELS LAKE GATE #1 #2 #1 #2 OUTFLOW GRR NO CHANGE 5195 NRR NO CHANGE 1118 BRR NO CHANGE 3500 RRR NO CHANGE 1743 STATION TIME STAGE FLOW GREENSBURG 0600 9.98 4854 COLUMBIA 0600 3.40 166 MUNFORDVILLE 0600 11.71 6740 BROWNSVILLE 0600 30.71 -901 ALVATON 0600 6.02 462 BOWLING GREEN 0600 10.67 4152 DUNDEE 0600 14.24 1922 Remarks: GRR - NRR - BRR - RRR - no change tkm GREEN RIVER 03 JUL 2025 at 0751 (Checked by: ______________) GREEN RIVER BASIN 03 JUL 2025 at 0751 24 HOUR GATE AND/OR BY-PASS CHANGES FOR 02 JUL 2025 MAIN BY-PASSES LEVELS OUT- LAKE TIME POOL GATE #1 #2 #1 #2 FLOW RRR 0700 506.18 0.70 0.00 0.00 0 0 1748.0