Louisville District Daily Lake Report
28 October 2020
Lake Elevations and Flood Storages
Basin Project Winter
Pool
Feet
Summer
Pool
Feet
Flood
Pool
Feet
Todays
Pool
Feet
Dev.
from
Pool
Feet
24 Hour
Change
Feet
24 Hour
Precip
Inches
6 A.M.
Outflow
CFS
Inches
Avail
Percent
Util
Little Miami CaesarCreek 846.0 849.0 883.0 847.1 0.0 0.0 0.0 100 11.52 -0.13
WHHarsha 729.0 733.0 795.0 730.6 0.1 0.0 0.0 31 10.91 0.09
Mill Creek WestFork 675.0 675.0 702.0 675.2 0.2 0.0 0.0 2 6.19 0.36
Mad River CJBrown 1009.0 1012.0 1023.0 1010.4 0.1 0.0 0.0 41 6.87 0.43
Whitewater Brookville 740.0 748.0 775.0 745.9 0.2 -0.1 0.1 490 9.22 0.11
Licking CaveRun 724.0 730.0 765.0 727.7 1.1 -0.2 0.0 715 9.30 1.93
Kentucky CarrCreek 1017.0 1028.0 1055.0 1024.8 3.0 -0.3 0.0 81 8.34 6.07
Buckhorn 757.0 782.0 840.0 777.8 4.3 -0.4 0.0 262 6.70 1.78
Salt River Taylorsville 545.0 547.0 592.0 547.0 0.0 -0.3 0.0 461 10.90 -0.03
Green River Green 668.0 675.0 713.0 674.8 0.3 0.0 0.0 431 13.19 0.50
Nolin 490.0 515.0 560.0 506.4 -0.7 -0.3 0.0 1051 12.91 -1.80
Barren 525.0 552.0 590.0 546.6 2.7 -0.1 0.0 475 12.32 1.76
Rough 470.0 495.0 524.0 491.5 5.0 -0.2 0.0 223 9.56 6.29
Mid. Wabash CMHarden 640.0 662.0 690.0 659.5 3.7 -0.6 0.0 604 7.52 5.18
CaglesMill 636.0 639.5 704.0 638.3 0.3 -0.2 0.1 152 12.78 0.27
Monroe 538.0 538.0 556.0 537.1 -0.9 0.0 0.0 55 11.42 -3.79
Patoka 532.0 536.0 548.0 534.4 -1.0 0.0 0.2 61 14.89 -7.21

(ALWAYS WEAR YOUR LIFE JACKETS WHEN ON OR NEAR THE WATER)

Comments:
Opperational control of Upper Wabash and all of its projects has been turned over to Chicago District as of Oct 1, 2020.

Highest Pool Elevations of Record

Contact Page Master