UPPER WABASH BASIN 08 JUL 2025 at 0702 MAIN BY-PASS DATA INST AVG POOL EL 24 HR GATE OPENINGS LEVEL OUT- 24 HR % LAKE TIME FT-MSL CHG-TND OPNGS #1 #2 #1 #2 FLOW INFLOW STOR HTR 0600 749.82 -0.0 0.00 0.50 0.00 0 0 77 77 0.5 SRR 0600 755.29 +.01 0.00 0.30 0.30 0 0 32 46 0.4 MSR 0600 737.28 0.1 0.00 0.30 0.30 3 3 52 216 0.3 RAIN PRES AIR TEMP TAILWATER LAKE TIME INCH WTHR PRE MAX MIN EL-MSL FLOW TEMP HTR 0600 0.00 CLR 61 80 61 9.34 84 25.5 SRR 0600 0.02 CLR 60 83 60 2.57 54 20.7 MSR 0600 0.00 PCLD 62 82 62 0.64 59 22.0 PREVIOUS 24 HOUR ELEVATIONS 0600 1200 1800 2400 HTR 749.82 749.81 749.82 749.83 SRR 755.28 755.29 755.29 755.29 MSR 737.18 737.21 737.24 737.25 OUTLET SETTINGS (ANTICIPATED NEXT 6 AM) MAIN BY-PASSES LEVELS LAKE GATE #1 #2 #1 #2 OUTFLOW HTR 0.00 0.70 0.00 0 0 96 SRR NO CHANGE 32 MSR 0.00 0.50 0.40 3 3 118 STATION TIME STAGE FLOW BLUFFTON 0600 1.37 48 WARREN 0600 6.47 44 WABASH 0600 2.66 221 MARION 0600 1.30 111 PERU 0600 4.70 300 LOGANSPORT 0600 3.30 815 Remarks: HTR - SRR - MSR - UPPER WABASH 08 JUL 2025 at 0702 (Checked by: ______________) UPPER WABASH BASIN 08 JUL 2025 at 0702 24 HOUR GATE AND/OR BY-PASS CHANGES FOR 07 JUL 2025 MAIN BY-PASSES LEVELS OUT- LAKE TIME POOL GATE #1 #2 #1 #2 FLOW